Thanks for your request
We'll send you an email notification once the hunt is launched.

Want it sooner?

Share this link with your friend, forums and social networks. The more requests the product gets, the sooner we'll launch the hunt!

  • 1Start A Hunt
  • 2Gather Interest
  • 3Grouphunt Negotiates
  • 4Deal goes live
Thanks for starting a hunt!
Give us a moment to review your listing. We'll let you know once it's published. In the meantime, gather interest by sharing it with your friends!
Share this hunt
Welcome to Grouphunt    Learn how it works!

The Merino Tech Line 2.0 is designed for the active, urban and nature dweller. They are busy people making their way through the hustle and bustle to work during the weekdays, exploring in the city or wilderness on the weekend. On cozy Winter days, you can find them in coffee shops, reading a book or the newspaper, sipping on their daily joe. Or perhaps, you will find them lying on the grass with the sun beaming on their freckles on a bright, windy summer afternoon. The Merino Tech Line 2.0 is made for those who make the most of each season.

The 360

Created for the adventurers. Whether you're climbing a mountain in the winter or camping in the summer, The 360 has you covered every step of each day.

Special Note: after voting from the backers, the sleeve opening for 360 Hoodie is now a thumbhole sleeve opening--nylon thumbhole for nylon side and merino thumbhole for merino side.

The 360 for him, nylon side and merino side
The 360 for him, nylon side and merino side

 

The 360 for her, nylon side and merino side
The 360 for her, nylon side and merino side

The Minimal

Designed for the weekday warriors, commuting to work and being swift in the process. It is designed with simplicity in mind but functionality at heart. Let The Minimal guide your journey work to date night.

Special Note: after discussing with backers, there will be an optional detachable hood (lined with Merino wool, and with hidden magnets) offered for The Minimal Jackets

The Minimal for him, nylon side and merino side
The Minimal for him, nylon side and merino side

 

The Minimal for her, nylon side and merino side
The Minimal for her, nylon side and merino side

The Magic of Merino + High Tech Nylon

The Merino Tech 2.0 line is made up of 70% pure Merino wool + high-tech stretchy and water-proof nylon fabric; merino wool is a natural, renewable and biodegradable material that is great for the environment, The natural fibres are lightweight, soft and breathable allowing you to perform in comfort. Merino adapts to your body temperature keeping you warm or cool all year round. A true no-fuss material, Merino wool is odour resistant, machine washable, and can be simply hung for a day to restore its freshness.

Pure merino wool
Pure merino wool

Waterproof Nylon: Don't fear the rain! Stay cozy and dry with The Minimal and 360.

Water proof
Water proof

 

 3.gif 
Water Resistant

Water-proof Technique:

Water-proof technology combines fabric and construction to create a resistance: The water-proof membrane part of the jacket allows warmth to remain, while the outer shell propels any liquid.

Water-proof and Breathable
Water-proof and Breathable

 

Seams covered
Seams covered

 Both jackets feature waterproof YKK zippers: Keep dry while staying active

Water-proof YKK zippers
Water-proof YKK zippers

Comfort AND Function

Made from Technical Merino and High-tech Stretchy and Ultra-light Nylon fabric, reversible, foldable and created with an innovative pocket system that allows maximum storage for everyday items. Your transit pass will always be handy.

Wrist/Arm pocket

Wrist/Arm pocket

Image and video hosting by TinyPic

Convenient for Transit

Reversible: For those "Oh no! They saw me in this yesterday!" moments.

Image and video hosting by TinyPic 

Foldable: When you just don't feel like tying your jacket around your waist.

  1.gif

Maximized Jacket Storage Space: No bags needed. Be swift on your daily commute! This jacket line is perfectly detailed for comfort without compromising style.

 13.gif

Jacket Pockets

 

Versatile pocket system
Versatile pocket system

 Oversized hood:

The 360 hood details for him
The 360 hood details for him

 

The 360 hood details for her
The 360 hood details for her

Built-in microfiber cloth:

Built-in microfiber cloth
Built-in microfiber cloth

Let us take care of you on your next adventure whether you're snowshoeing up Mount Baker, hopping on an airplane, running in the rain or enjoying the summer breeze on top of the Eiffel Tower.

Whatever the occasion, we've got you covered
Whatever the occasion, we've got you covered

What About Sizes?

There's nothing more annoying than getting a jacket that doesn't fit! Here's a handy chart to help you with sizing.

The 360 for him
The 360 for him

 

The 360 for her
The 360 for her

 

The Minimal for him
The Minimal for him

 

The Minimal for her
The Minimal for her

 

Discussion
Original Link
indiegogo.com
DISCOVERED BY ... Chuwen
LIVE HUNTS YOU'LL LOVE

Flat Rate Shipping

100% Authencity Guaranteed

Powered by 30,000+ Enthusiasts

Unbeatable Value